About Us

  • Coporate Profile
    • overview
    • mission
    • business principles
    • history
    • ci
  • CEO
    • greeting
    • profile
  • global network
    • domestic network
    • overseas network
  • career

products/technology

  • shipbuilding&offshore
    • overview
    • product information
    • major performance
  • power&control system
    • overview
    • product information
  • wind energy business
    • overview
    • product information
  • technology development
    • overview
    • new technologies

investor relations

  • financial information
    • financial highlights
    • Financial statements
    • audit reprot
  • stock information
    • real time quotes
    • intraday quotes
    • daily quotes
    • chart analysis
    • market view
    • foreign holding
  • IR reports
    • annual report
    • IR presentation

PR center

  • news&issues
  • goege shipyard
  • Be first & best
  • ship story
    • basic information on ships
    • type of ships
    • ship construction process

sustainability

  • compliance management
  • ethics management
  • green management
    • overview
    • achievements
    • climate change policy
  • HSE
    • mamagement principles
    • health
    • safety
    • environment
  • social contribution
  • report

customer service

  • quality assurance
    • quality policy
    • samsung q-mark
    • qualification / certification
    • cerfified welders
  • quality control
    • plus program
    • procedure of claim
    • a/s agent network
  • customer business guide
    • ISA introduction
    • visa & immigration
    • Accommodation & site office
    • work-related service
    • insurance & foreign school

contact us

  • Q&A
  • contact us

News

Home PR Center News

view
title Samsung Heavy Industries Builds World’s Largest Wind Farm Installation Vessel
date 2012.07.26

◇ World’s Largest Wind Farm Installation Vessel Enables the Transportation and Installation of
    12 units of 3.6MW-class wind farms
    - The high-performance vessel also provides scalability in terms of the installable depth,
      and allows the installation of ultra-large wind farms

◇ New Special Vessel Market Expected to Be Expanded as Offshore Wind Power Generation Emerges
    - Samsung Heavy Industries Favorably Positioned to Win Additional Orders thanks to the Successful Shipbuilding Experience



Pacific Orca, the world’s largest wind farm installation vessel, is ready for launch.


Samsung Heavy Industries announced on the 25th that it had successfully built Pacific Orca, the world’s largest wind farm installation vessel (WIV), and delivered it to SPO (Swire Pacific Offshore), a Singapore-based shipper.

The wind farm installation vessel is a new special vessel for which demand is expected to grow as the focus of the wind power generation market shifts from in-land wind farms to offshore wind farms.

The capacity of global offshore wind farms is expected to grow rapidly, and to reach 239GW by 2030, which is about 70 times the 3.5GW capacity (1,000 units of 3.5MW-class power generators) it has today. The shipbuilding industry has focused on developing the related technology based on predictions of a rapid increase in the demand for wind farm installation vessels.

Samsung Heavy Industries won an order to build Pacific Orca in July 2010. Pacific Orca is 161m long, 49m wide and 10.4m high, and as the world’s largest wind farm installation vessel, it is capable of transporting and installing 12 units of 3.6MW.

It also allows installation of wind farms to a depth of 60m, which is the deepest in the world, as well as the installation of ultra-large wind farms with a capacity of 10MW or higher, which are being developed in the industry to meet the demand for larger wind farms.

Existing wind farm installation vessels are fixed at the sea bottom with jack-up lags embedded in the vessels, and the installation work is performed after vessels are floated to minimize the impacts of tides and waves.

The vessel built by Samsung Heavy Industries is floated up to 17m above sea level, using six legs, and the 1,200t crane embedded on the vessel allows the installation of power generation towers, power generation rooms and wings.

In particular, the vessel allows the installation of wind farms under extreme conditions with the velocity of 20m per second and waves that are 2.5m high.

CEO Roh In-Sik of Samsung Heavy Industries said, “The fact that we have now successfully built this world’s largest wind farm installation vessel guarantees our competitiveness in future bids. We also expect that this achievement will create synergies between the shipbuilding business of Samsung Heavy Industries and the wind power business, which is one of the promising renewable energy businesses.”



This shot of Pacific Orca was captured while it was being built at Samsung Heavy Industries’ Geoje Shipyard. It is interesting to see the floated vessel using jack-up legs.

pre SHI Signs Agreement to Sponsor the Establishment of an IT Center at a Public School in India 2012.08.27
next SHI Writes New Chapter in the History of Offshore Plants 2012.01.19

list print

RSS Service Samsung Heavy Industries offers  an RSS service!
RSS stands for RDF Site Summary or Rich Site Summary, and is a program that will notify you of updates to a registered website at a fixed point in time. RSS services require an RSS reader and an RSS-supporting websites. Samsung Heavy Industries supports RSS for your convenience!
RSS